Landmark – Development

  Project Name: Landmark    Location: Basildon, Essex, UK System Used: Modular Timber Frame Time Frame: 12 weeks Development: 14 Residential units   Specification External Wall U-Value: 0.12W/m2K Floors:Engineered I-Beam Floor joists with Egger Protect Flooring Cladding: Brick

Read More

Halstead – Development

  Project Name: Halstead    Location: Essex UK System Used: Closed Panel Timber Frame Time Frame: TTFC were on site for two weeks Development: Four Residential units over carports   Specification External Wall U-Value: 0.12W/m2K Floors: Metal web joisting with Egger Peelclean Xtra Cladding: Brick        

Read More

Darsham – Development

    Project Name: Darsham – Development   Location: Saxmundham, UK System Used: Closed Panel Timber Frame Time Frame: Commenced first phase in 2018 with completion of all phases due in 2021. Development: 20 residential units consisting of two, three, four and five bedrooms homes. The development also consists of a Village Hall.   Specification […]

Read More

Tipperary – Development

  Project Name: Tipperary – Development   Location: Newport, Co. Tipperary, Ireland System Used: Standard Timber Frame Completed: 2019 Value: €300k     Development: 14 Units consisting of 3 bedroom detached, 2 bedroom bungalows and 3 bedroom semi detached   Specification External Wall U-Value:  0.17W/m2K Floors: Solid Joist with 18mm OSB3 TG2 sheeting Cladding: Combination of Brick […]

Read More

Surrey – Apartments

  Project Name: Pinewood House   Location: Surrey, UK System Used: Closed Panel Completed: 2015 Value: £490,000 Development: Three story, 12 unit apartment block with retail units at ground level.   Specification External Wall U-Value: 0.21 W/m2K Windows & Doors: uPVC Double Glazed Floors: Metal web Joists 18mm OSB3 Cladding: Timber        

Read More

Herb Farm – Development

During 2017 & 2018 TTFC were part of the team to produce this luxury five house development. A beautiful development involving of 4 and 5 bedroom homes close to the country side. Each home has its own unique stamp but keeping within style of the other. The client choose to use the TTFC hybrid system […]

Read More

Torquay – Apartments

Photo Credit: https://www.renaissanceretirement.co.uk/babbacombe/ This project is a 9 Unit luxury apartment block built in Devon with retired persons in mind, the apartments comprised of a number of different styles with single story and duplex apartments available.   Project Name: Torquay  Location: Devon, UK System Used: Closed Panel Completed: 2017 Value: £464,000 Development: Consist a 9 Unit luxury apartment block built […]

Read More

Offices & Manufacturing Unit

    Location: Norfolk, UK System Used: Closed Panel Completed: 2013 Value: £80,735 Development: An office and manufacturing facility   Specification External Wall U-Value: 0.14 W/m2K Windows & Doors: uPVC Double Glazed Floors: Metal web Joists 18mm OSB3 Cladding: Timber    

Read More

Sherwood Drive – Development

  Project Name: Sherwood Drive   Location: Sherwood Drive, Bletchley, Milton-Keynes System Used: Closed Panel Completed: 2016 Value: £1.7m Development: 56 units   Specification External Wall U-Value: 0.27W/m2K Windows & Doors: uPVC Double Glazed Floors: Solid Joist with 18mm OSB3 TG2 sheeting Cladding: Brick    

Read More

Landor Road – Development

Photo Credit: https://www.naganjohnson.co.uk/selected-work/landor-road/   Project: Three apartments over three stories Location: Landor Road, London, UK System Used: Closed Panel Completed: 2016 Value: £175,000   Specification External Wall U-Value: 0.14W/m2K Floors: 222×44 Floor joists at 400mm centres covered in 18mm OSB3 T&G Flooring Roof: 222×44 Roof Joists at 400mm centres with firring pieces covered in 18mm OSB3 T&G Sheeting    

Read More

Clock House Gardens – Development

Photo credit: Morley von Sternberg   Clock House Gardens consists of 50 homes within five two and three-storey buildings.   Project Name: Clock House Gardens Completed: 2015 Location: Welwyn, Hertfordshire System used: Open Panel Building Size:  4281.0 m2      

Read More

UK Border Agency Holyhead Port

      Project Name: UK Border Agency Location: Holyhead Port, Wales System Used: Closed Panel Completed: 2013 Value: £137,000   Specification External Wall U-Value: 0.23W/m2K Windows: Aluminium Windows Floors: 225x45mm Solid Timber Joist covered with 18mm OSB3 T&G Flooring Roof: 225x45mm Solid Timber Joists with firring pieces with 18mm WBP Ply External Finish: TTFC supplied and fitted battens and […]

Read More

Clog na Léinn – Development

                                                                                                Project Name: Clog Na Léinn Location: Collinstown, […]

Read More

Dog’s Trust Salisbury

  Project Name: Dog’s Trust Completed: 2017 Location: Salisbury, England   System used: Closed Panel Cladding: Marley Eternit Cedral Cladding Building Size:  5 Separate Buildings   Specification External Wall: 0.20w/m2k Windows: N/A     Years Experience: 1 Year Developer: McPhillips   Pictures courtesy of Dog’s Trust Salisbury    

Read More

Abbotts Langley – Self Build

  Project Name: Abbots Langley Completed: 2016 Location: Abbots Langley System used: Closed Panel   Specification External Wall: 0.20w/m2 Windows: Double glazed UPVC Cladding: Brick/Timber   Architectural Technician: Wayne Webster  

Read More

St. Georges Primary School

    St. Georges Primary School was designed by Baxall Construction. Phase 1 consisted of nine classrooms over two floors. The project was on site and erected in 8 weeks. Phase 2 is currently in the design process.   Project Name: St. Georges Primary School – Baxall Construction Completed: 2015 Location: Broadstairs, Kent, UK System used: Closed Panel Building Size:  […]

Read More

Roe Green Nursery School

Photo Credit: Roe Green Infant School Roe Green Nursery consists of two stores with a roof terrace playground. The ground floor and first floor are identical and consisted of two large classroom with toilet facilities and kitchenette. The center core consisted of a stairwell to the three stories and a lift shaft with access from ground […]

Read More

Craylands – Development

      In 2015, TTFC secured a contract for 50 new social housing units in Essex. The project was spread over 12 months and ranged from 2 storey houses to 3 storey apartments blocks. The kit comprised of 140×38 CLS stud to the external wall with 120mm insulation factory fitted. TTFC also installed the vapour […]

Read More

Langford – Development

In 2016, we completed phase 1 of this fine development.   Specification: The first phase of 7 houses utilised our closed panel timber frame system. The products used were: External Wall – 0.14W/m2K Floors – Metal web joisting with Egger Peelclean Xtra Cladding – Various finishes including timber, brick, render   Detail: The houses ranged […]

Read More

Alperton Community School

      Project Name: Alperton Community School During 2012, TTFC were involved in the build of a 2 class room block for a community school in Wembley. With a classrooms in each wing of the building and office space and sensory area and toilets included in the internal rooms of the build. It was a […]

Read More

Yvette & Carston – Self Build

    Specification: External wall U-Value – 0.14W/m2K ACH @ 50 pascal: 2.8 TTFC system – Closed panel timber frame Windows – Double Glazed Woodgrain PVC Heating system – Air to water heat pump HRV system – Yes Photovoltaic Panels – Yes  

Read More

Milton Keynes – Development

  Specification: External wall U-Value:  0.14W/m2K TTFC system: Closed panel timber frame Windows: Double Glazed Wood-grain PVC Solar Panels: Yes   In 2015, we completed a project that consisted of 13 bungalow specially design for disabled access. The key element was the installation on site. The design and manufacture of the product was important, but the speed of installation […]

Read More

Monart Spa

Monart House Hotel & Spa In 2005, TTFC were contracted to construct bedrooms at Monart House Hotel & Spa. Monart, which has been voted in the top 3 spas in the world plus many more awards, is situated just 20 minutes from our head office in Wexford, Ireland. This high profile project was completed using our […]

Read More

Lisheen Nursing Home

In 2012, we completed a 30,000sqft nursing home in Rathcoole, Dublin. The project was split into 3 phases and was an extension to an existing care unit. When we re-visited the building last year the building has been performing very well and still looked as good as when it was completed. The building was originally […]

Read More